Transformer Maintenance & Testing Services

Complete maintenance, oil filtration, leakage arrest and comprehensive electrical testing for 22 MVA transformer.

22 MVA Power Transformer - On-site Maintenance
100%

Operational Reliability

40%

Downtime Reduction

22 MVA

Transformer Rating

0

Oil Leakages After Service

01
Project Overview

The client operates a 22 MVA transformer that is critical to plant continuity. Ageing
insulation, oil level inconsistencies and missing test records were raising the risk of
unplanned outages. ElectroCore Arabia was engaged to restore reliability through a
single, coordinated maintenance programme.

02
The Challenge
  • Degraded oil quality and rising moisture content
  • Gasket and valve leakages at multiple points
  • No recent electrical test baseline for decisions
  • Tight shutdown window to limit production loss
03
Our Solution

Our engineers planned the shutdown, filtered and dried the oil on site, arrested every
leak and ran a full suite of electrical tests before re-energising.

  • Hot oil filtration and dehydration
  • Leakage arrest and gasket replacement
  • Insulation resistance, ratio and winding resistance tests
  • Final report with recommendations
Project Details
Client Industrial Plant
Service Maintenance & Testing
Equipment 22 MVA Transformer
Location Saudi Arabia
Duration 5 Days
Services Delivered
  • Oil Filtration
  • Leakage Arrest
  • Electrical Testing
Need similar service?

Talk to our engineers today.

Get A Quote

Our Process

01
Inspection

Site survey and condition assessment of the unit.

02
Oil Filtration

On-site purification to restore dielectric strength.

03
Leak Repair

Sealing and gasket replacement at all leak points.

04
Testing

Full electrical tests and handover report.